We retain improving upon and perfecting our items and repair. At the same time, we perform actively to do research and progress for Water Treatment , Mbr Wastewater , Mbr Treatment Plant , Our professional technological team will be wholeheartedly at your services. We sincerely welcome you to definitely take a look at our website and enterprise and send out us your inquiry.
Original Factory Membrane Process In Water Treatment - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo Detail:
Applications
Drinking water treatment of tap water, surface water, well water and river water.
Pretreatment of RO.
Treatment, recycle and reuse of industrial waste water.
Filtration Performance
This product is proven to have below filtering effects according to the service conditions of different water sources:
Ingredient |
Effect |
SS, Particles > 1μm |
Removal Rate ≥ 99% |
SDI |
≤ 3 |
Bacteria, Viruses |
> 4 log |
Turbidity |
< 1NTU |
TOC |
Removal Rate: 0-25% |
*Above data is obtained under the condition that feeding water turbidity is < 25NTU.
Product Parameters

Technical Parameters
Filtering Type |
Outside-in |
Membrane Material |
Modified PVDF |
MWCO |
200K Dalton |
Membrane Area |
78m2 |
Membrane ID/OD |
0.8mm/1.3mm |
Dimensions |
Φ250mm*1710mm |
Connector Size |
DN50 Clamping |
Application Data
Pure Water Flux |
15,000L/H (0.15MPa, 25C) |
Designed Flux |
40-120L/m2.hr (0.15MPa, 25C) |
Suggested Working Pressure |
≤ 0.2MPa |
Maximum Transmembrane Pressure |
0.15MPa |
Maximum Backwashing Pressure |
0.15MPa |
Air Washing Volume |
0.1-0.15N m3/m2 .hr |
Air Washing Pressure |
≤ 0.1MPa |
Maximum Working Temperature |
45C |
PH Range |
Working: 4-10; Washing: 2-12 |
Operating Mode |
Cross Flow |
Feeding Water Requirements
Before feeding water, a security filter < 50 μm should be set to prevent blockage caused by large particles in raw water.
Turbidity |
≤ 25NTU |
Oil & Grease |
≤ 2mg/L |
SS |
≤ 20mg/L |
Total Iron |
≤ 1mg/L |
Continuous Residual Chlorine |
≤ 5ppm |
COD |
Suggested ≤ 500mg/L |
*Material of UF membrane is polymer organic plastic, there must not be any organic solvents in raw water.
Operating Parameters
Backwashing Flow Rate |
100-150L/m2.hr |
Backwashing Frequency |
Every 30-60min. |
Backwashing Duration |
30-60s |
CEB Frequency |
0-4 times per day |
CEB Duration |
5-10min. |
CIP Frequency |
Every 1-3 months |
Washing Chemicals: |
Sterilization |
15ppm Sodium Hypochlorite |
Organic Pollution Washing |
0.2% Sodium Hypochlorite + 0.1% Sodium Hydroxide |
Inorganic Pollution Washing |
1-2% Citric Acid/0.2% Hydrochloric Acid |
Component Material
Component |
Material |
Membrane |
Modified PVDF |
Sealing |
Epoxy Resins |
Housing |
UPVC |
Product detail pictures:
Related Product Guide:
We'll make each hard work to become excellent and excellent, and speed up our measures for standing from the rank of intercontinental good -grade and high-tech enterprises for Original Factory Membrane Process In Water Treatment - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo , The product will supply to all over the world, such as: Brunei, Czech Republic, Gambia, In order to meet the increasing requirement of customers both home and aboard, we will keep carrying forward the enterprise spirit of Quality, Creativity, Efficiency and Credit and strive to good the current trend and lead fashion. We warmly welcome you to visit our company and make cooperation.