New Delivery for Mbr Plant - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The key to our success is Good Product Quality, Reasonable Price and Efficient Service for Mbr Wastewater , Membrane Flux , Membrane Filtration Method , If you pursuit the Hi-quality, Hi-stable, Competitive price parts, company name is your nice choice!
New Delivery for Mbr Plant - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water Output Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering Direction Outside-in
Membrane Material Reinforced Modified PVDF
Precision 0.03  micron
Membrane Area 30m2
Membrane ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint Size Φ24.5mm

Component Material

Component Material
Hollow Fiber Membrane Reinforced Modified PVDF
Sealing Compound Epoxy Resins + Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH Range 5-9 (2- 12 when washing) Neutral PH is better for bacterial culture
Particle Diameter <2mm Prevent sharp particles to scratch membrane
Oil & Grease ≤2mg/L Prevent membrane fouling/sharp flux decrease
Hardness ≤150mg/L Prevent membrane scaling

Application Parameters

Designed Flux 15~40L/m2.h
Backwashing Flux Twice the designed flux
Operating Temperature 5~45°C
Maximum Operating Pressure -50KPa
Suggested Operating Pressure ≤-35KPa
Maximum backwashing Pressure 100KPa
Operating Mode Continuous opeartion, intermittent backwashing air flushing
Blowing Mode Continuous Aeration
Aeration Rate 4m3/h.piece
Washing Period Clean water backwashing every 1~2h; CEB every 1~2 days;Offline washing every 6~12 months

(Above information is for reference only, please adjust

according to actual differential pressure change rule)


Product detail pictures:

New Delivery for Mbr Plant - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

To fulfill the customers' over-expected fulfillment , we have now our solid staff to deliver our great general assistance which includes internet marketing, product sales, creating, manufacturing, excellent controlling, packing, warehousing and logistics for New Delivery for Mbr Plant - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Pakistan, Romania, panama, We attained ISO9001 which provides solid foundation for our further development. Persisting in High quality, Prompt Delivery, Competitive Price, we have established long-term cooperation with clients from both overseas and domestically and get new and old clients' high comments. It is our great honor to meet your demands. We are sincerely expecting your attention.
  • The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
    5 StarsBy Cherry from Greenland - 2017.02.14 13:19
    Wide range, good quality, reasonable prices and good service, advanced equipment, excellent talents and continuously strengthened technology forces,a nice business partner.
    5 StarsBy Amelia from Swiss - 2018.07.27 12:26
    Write your message here and send it to us
    Baidu
    sogou